Projects

The Cabinet Place’s client base consists largely of construction companies of all sizes, architectural firms, interior designers, kitchen specialists and retailers. We are also available for a range of outsourcing work; particularly in situations where shop fitting companies are either overcommitted with current projects or simply don’t have manpower and equipment available to deal with large or specialist assignments.

New/Existing Projects:

  •  Sofitel Viaduct Harbor Fit-out (CP Group)
  • SO Hotel Custom Street Mock-up Rooms (CP Group)
  • Grand Mercure Auckland (CP Group) 65 Premium Rooms
  • Grand Mercure Auckland Lobby & Reception area
  • Park Residence Apartments (Naylor Love) 275 Apartments
  • Metropolis Hotel Upgrade (110 Apartments)
  • Live Pharmacy Norhthcote
  • Ranfurly Village
  • Kensington Park

Projects Completed in the last 18 Months:

    • Papamoa College – (Hawkings Constructions)
    • Mt Wellington Dental Clinic – (Teak Constructions)
    • Edmington, Glenfield and Henderson Dental Clinics – (Gibson Occonor)
    • Shell Waiuku (Cassidy Constructions)
    • Otahuhu College (Teak Constructions)
    • Laidlaw College (Teak Constructions)
    • Mt Alber Grammar Stage 1&2  (Macrennie Constructions)
    • Avondale College (Alliance Constructions)
    • Vero Building (Impact Interiors Construction)
    • Shell Waioru (Cassidy Constructions)
    • Remuera Childcare (Willkran constructions)
    • Manurewa Police Station (Mainzeal Construction)
    • Air New Zealand upgrade (Hawkins Interiors)
    • Belmont Dental Clinic (Hawkins Constructions)
    • Wakaaranga Dental Facility (Mainzeal Constructions)
    • North Cross Dental Facility (Hawkins Constructions)
    • Howick Dental Facility (Stryde Projects)
    • Mt Alber Stage 3&4 Grammar (Macrennie Constructions)
    • Pullman Hotel Levels 16 and 17 plus Pent house (CP Group)
    • Vision Dannymora Retirement Village Stage 3 (Livingstone)
    • Taradale Z Energy (Cassidy Constructions)
    • Bank Stream Offie Fitout (PRACTEC)
    •  Lessmills Victoria Street (Cape Interiors)
    •  Salvation Army Mt Wellington (Arrow International)
    •  Manukau Prescinct Project (Watts & Hughes Construction)
    • Palmers Waste Gate ( CEMAC Interiors)
    • Tatua Labs (Ebbert Construction)
    • Yashilli Milk Processing Plant (Ebbert Construction)
    • Auckland Central Police Station (Whatts & Hughes Construction)
    • 464 Remuera Road Apartments ( Whatts & Hughes Construction)